Our Manufacturing Facility

Here’s a brief step-by-step tour of our in-facility process. We hope that viewing the photos will encourage you to come for a personal tour of our manufacturing facility!

  • ArialShotUnibilt

    Arial Photo of Unibilt Custom Homes Manufacturing Plant

    ArialShotUnibilt
  • 1300a_DeckFraming

    Floor deck is framed from precision, pre-cut lumber from the Unibilt warehouse.

    1300a_DeckFraming
  • 1300b_ExteriorWalls

    Exterior sidewalls are prepared for mounting on the floor deck, using 2 x 6 construction.

    1300b_ExteriorWalls
  • 1300c_FoamAdhesive

    Foam adhesive attaches drywall to exterior and center wall framing.

    1300c_FoamAdhesive
  • 1300d_CraneSet_SideWall

    Completed sidewalls are raised for mounting on the floor deck.

    1300d_CraneSet_SideWall
  • 1300e_RoofConst

    Engineered roof trusses, designed and built in-house, are assembled on roof jig table.

    1300e_RoofConst
  • 1300f_CraneSetRoof

    Cranes position the roof on the frame. The roof is…rt and efficient completion on the building site.

    1300f_CraneSetRoof
  • 1300g_Electrical_A2543

    Electrical, telecommunication and data systems are wired into the house before the drywall goes up.

    1300g_Electrical_A2543
  • 1300h_Plumbing

    Plumbing is installed using quality, flexible products.

    1300h_Plumbing
  • 1300i_TapingDrywall

    The drywall goes up and is expertly taped and finished.

    1300i_TapingDrywall
  • 1300j_Insulation

    The wall insulation is put into place.

    1300j_Insulation
  • 1300k_Sheathing

    Roof sheathing is installed to enclose the top of the home.

    1300k_Sheathing
  • 1300l_WeatherProtect

    The high ceilings of the Unibilt plant allow for t…tion that has never been exposed to the elements.

    1300l_WeatherProtect
  • 1300m_Subsiding

    A layer of sub-siding is applied to exterior walls.

    1300m_Subsiding
  • 1300n_Painting

    Ceilings are expertly finished, and interior walls are painted.

    1300n_Painting
  • 1300o_Windows

    Windows are each professionally and carefully set by Unibilt’s window specialists.

    1300o_Windows
  • 1300p_Siding

    After the house wrap, siding is installed.

    1300p_Siding
  • 1300q_Doors

    Doors, both interior and exterior, are hung and co…letely installed for years of excellent function.

    1300q_Doors
  • 1300r_Flooring

    Flooring, from a wide selection of products, is installed.

    1300r_Flooring
  • 1300s_Countertops

    Counter tops are fabricated in-plant for a perfect fit.

    1300s_Countertops
  • 1300t_Cabinets

    Choice, quality cabinets are installed in a beautiful Unibilt kitchen.

    1300t_Cabinets
  • 1300u_TouchUp

    Paint is touched up, nicks are eliminated and each section is inspected for a quality finish.

    1300u_TouchUp
  • 1300v_Delivery

    One module of a new home is wrapped up and ready for delivery.

    1300v_Delivery

Do you want to take a
LIVE FACILITY TOUR?

Visitors will be eligible for $500 of free upgrades upon purchase of a Unibilt home within 12 months of the tour.
If you’d like to RSVP for a manufacturing facility tour, just fill out the form below. Tours are held the second Saturday of each month starting promptly at 10 a.m. and lasts up until Noon at our factory located at 8005 Johnson Station Road in Vandalia, Ohio. You are not required to RSVP for the tour, but doing so helps us to properly plan for your visit.
Just tell us who you are:
Not Required
Required
Required
Required
Required
Not Required
Not Required
Not Required
Not Required
Not Required
Do You Own a Lot?
Do You Own a Lot?
Not Required
Not Required
CAPTCHA image
Enter the code shown above:
 
Select the search type
  • Site
  • Web
Search