Here’s a brief step-by-step tour of our in-facility process. We hope that viewing the photos will encourage you to come for a personal tour of our manufacturing facility!
ArialShotUnibilt
Arial Photo of Unibilt Custom Homes Manufacturing Plant
1300a_DeckFraming
Floor deck is framed from precision, pre-cut lumber from the Unibilt warehouse.
1300b_ExteriorWalls
Exterior sidewalls are prepared for mounting on the floor deck, using 2 x 6 construction.
1300c_FoamAdhesive
Foam adhesive attaches drywall to exterior and center wall framing.
1300d_CraneSet_SideWall
Completed sidewalls are raised for mounting on the floor deck.
1300e_RoofConst
Engineered roof trusses, designed and built in-house, are assembled on roof jig table.
1300f_CraneSetRoof
Cranes position the roof on the frame. The roof is…rt and efficient completion on the building site.
1300g_Electrical_A2543
Electrical, telecommunication and data systems are wired into the house before the drywall goes up.
1300h_Plumbing
Plumbing is installed using quality, flexible products.
1300i_TapingDrywall
The drywall goes up and is expertly taped and finished.
1300j_Insulation
The wall insulation is put into place.
1300k_Sheathing
Roof sheathing is installed to enclose the top of the home.
1300l_WeatherProtect
The high ceilings of the Unibilt plant allow for t…tion that has never been exposed to the elements.
1300m_Subsiding
A layer of sub-siding is applied to exterior walls.
1300n_Painting
Ceilings are expertly finished, and interior walls are painted.
1300o_Windows
Windows are each professionally and carefully set by Unibilt’s window specialists.
1300p_Siding
After the house wrap, siding is installed.
1300q_Doors
Doors, both interior and exterior, are hung and co…letely installed for years of excellent function.
1300r_Flooring
Flooring, from a wide selection of products, is installed.
1300s_Countertops
Counter tops are fabricated in-plant for a perfect fit.
1300t_Cabinets
Choice, quality cabinets are installed in a beautiful Unibilt kitchen.
1300u_TouchUp
Paint is touched up, nicks are eliminated and each section is inspected for a quality finish.
1300v_Delivery
One module of a new home is wrapped up and ready for delivery.